Study on the Betterment of Construction Capacity in SHIELD Method |
|
|
쉴드 공법의 시공성 개선에 관한 연구 |
김민성,한건모 |
남광토건주식회사,동아대학교 해양공학과 |
|
© 1998 The Korean Society of Ocean Engineers
Open access / Under a Creative Commons License
|
Keywords:
Excavation Work, Traffic Obstacle, Congestion, Electric Wires, Shield Method, Rockburst |
핵심용어:
굴착작업, 교통장애, 정체, 전력구, 가력막이공법, 산창 |
Abstract |
According to the developement of cities, electric wires and commuinication lines which are currently above the ground effect on the bad. Nowadays, it is necessary to build up underground facilities because the construction is increasing. Excavation work has been dominant even though the inconvenient things occurred, for example a civil appeal, a traffic obstacle, safety and spoiling the fine view because of the cost or period of the construction work. But the congestion of cities are more and more serious. Therefore shield-method is the way to escape from congestion. I considered all the construction fields which are in progress or finished. |
|